DESIGN PROCESS
-
PHASE ONE - SITE VISIT & CONSULTATION
The design process starts with a site visit and initial consultation. The main objective at this stage is to obtain a detailed understanding of your aspirations and needs for the garden, as well as getting a feel for the existing space. Following on from this, a written brief is sent to you, which outlines the fee structure, design process, and a comprehensive summary of your goals for the space.
-
PHASE TWO - CONCEPT DESIGN
The next step is a topographical survey of the site, which captures both the layout of the site as well as all levels and utilities. From this, concept designs are produced as well as moodboards to support the concept and bring it to life. At this stage, the focus is very much on the layout, rather than specific details.
-
PHASE THREE - DEVELOPED DESIGN
Produced after the concept design has been agreed, these drawings develop the chosen concept layout into an overall masterplan. Material palettes, spatial arrangements and locations, as well as a planting palette with general character of the planting will be proposed.
-
PHASE FOUR - TECHNICAL DESIGN
Once the masterplan is approved, technical drawings are developed. These include setting out plans, drainage lighting locations and levels as well as cross sections, construction details and elevations.
-
PHASE FIVE - PLANTING PLAN
The planting plan shows the locations of all the proposed plants, along with a plant schedule listing exact names, sizes and quantities used for costing, ordering and setting out. A moodboard of all plants is included so you get a feel for the look we are aiming to achieve. Illustrated maintenance plans ensure the garden can be kept as planned.
-
PHASE SIX - TENDER DOCUMENTS AND SITE INSPECTION
A tender package is put together and sent to landscape contractors to quote for the work. Once the build is underway, we offer the option for regular site visits to monitor progress and ensure the project is built according to the plans. The frequency of these visits is up to you - it can be as little as a site visit at the beginning and end of the build, to weekly minuted meetings.